Roseacre Primary School Facilities Refurbishment

Project type

Construction

Client

Roseacre Primary School

Location

Blackpool


Project Overview

Mayco Construction successfully transformed a dark, enclosed corridor and reception area at Roseacre Primary School in Blackpool into a bright, modern and welcoming reception and meeting space.

The project was delivered over a demanding six-week programme during the school summer holidays, ensuring the newly refurbished area was ready for pupils and staff returning for the new term.

Scope of Works

Mayco provided a complete, multi-trade refurbishment package, including:

  • Removal of the existing internal wall
  • Installation of new structural steelwork
  • Opening up the former reception wall to create a large serving hatch
  • New suspended ceilings and lighting
  • Installation of new fire doors
  • Small-power alterations
  • New access-control system
  • Installation of new radiators
  • Plastering, painting and decorating
  • New flooring throughout
  • Bespoke glazed reception screen
  • Glazed meeting-room walling
  • Bespoke bench seating with oak worktops
Roseacre Primary School Refurbishment by Mayco

Project Delivery

The works required careful planning and coordination to complete the structural alterations, building services and architectural finishes within the six-week school-holiday period.

Removing the existing walls and introducing new structural steelwork opened up the previously dark and restricted area. The addition of glazed screens and meeting-room walling maximised natural light while creating a secure, practical and professional reception environment.

New lighting, heating, power, access control and fire-safety provisions were incorporated alongside bespoke joinery and high-quality internal finishes.

Roseacre Primary School Refurbishment by Mayco

The Result

The completed refurbishment has created a bright, open and welcoming reception area that provides an improved first impression for pupils, staff and visitors.

The new meeting room, glazed reception screen and bespoke benching have also made the space more practical and versatile for the school’s day-to-day requirements.

Delivered in just six weeks, the project demonstrates Mayco Construction’s ability to manage complex, multi-trade refurbishment projects within challenging programmes and live educational environments.

Another successful transformation completed by the Mayco team.

Roseacre Primary School Refurbishment by Mayco

Need Construction Project Support?

info@mayco-uk.co.uk

01282 338409

Mayco provides construction, refurbishment and fit-out services for commercial and public-sector projects across the North West.

Office 9, Northlight Mill,
Northlight Parade, Brierfield,
Nelson BB9 5EG

Open every day, 24 hours a day